MINGLECONTROL is implemented in day-to-day business in as short a time as possible. This is because all customer wishes and requirements are tested in advance using a complete simulation. The software has therefore been completely tested once before the start of commissioning – almost like a dry run. This means that possible errors can be rectified before the implementation phase and the commissioning time is reduced to a minimum.
We are happy to carry out a FAT (Factory Acceptance Test) in advance at our factory, at the customer’s premises or via an online meeting together with the customer. This gives us the opportunity to take the customer’s optimization suggestions into account before commissioning and to optimize the recipe processes.